HOME : ABOUT US : USED MACHINERY : SPECIALS : LEASING : SERVICES : INFORMATION : DIRECTIONS : EMPLOYMENT : CONTACT : OCEANETTES
  steel fab machinery
steel fabricating machinery
steel fabrication equipment
Back to OCEAN MACHINERY : CLIPPER CNC Angle Line : LIBERATOR CNC Beam Coper : TERMINATOR Band Saw : ELIMINATOR Material Handling System
1 1 1 1
 
OCEAN aVENGER bEAM lINE
OCEAN AVENGER BEAM LINE
Is this the Beam Line for me?
Ocean Avenger Overview
Ocean Avenger Features
Beam Line Drill Specifications
Programming the Avenger
VIDEO - Beam Line Video
Beam Line Video Request
BUYING THE OCEAN AVENGER
Beam Line Cost Justification
Financing Your Ocean Avenger
Ocean Avenger Dealers
BEAM LINE TECHNICAL SUPPORT
Drill Bits for Beam Drill Lines
Drill Sharpening Tutorial
Beam Line Technical Support
Customer Trials
MATERIAL HANDLING
Ocean Eliminator Handling System
Ocean Flipper Beam Rotator
USED BEAM DRILL LINES
Used Beam Drill Lines
SITE MAP

Site Map

OCEAN AVENGER DRILLING W8x19 STEEL BEAM

W8x19 Steel beam – Time Study and Test

  General Observations 

  • We were able to get onto a customer's machine to conduct the trial during their lunch hour, so we had no opportunity to refine our approach prior to running each test.

  • The closest sized beam we had available to test was a W8x18".

    • Web height = 8-1/8" (210mm)

    • Thickness = 1/4" (6mm)

    • Y gauge was 2-3/8" (60mm)

    • X gauge was 2-3/4" (70mm)

    • No. of holes drilled = 98

  • The machine was running at 85% of cycle duty. We did not change this for the test.

  • A new operator on the customer’s machine had also unfortunately filled up the coolant tank with undiluted coolant. The coolant should be diluted 20:1.  The foaming coolant on the trail videos is not the normal situation and will not occur with the correct dilution.

  • Time taken to drill the 98 holes was 18min 40sec (11.4 seconds per hole)

  • In a regular production situation, the client will refine a more suitable approach based on the products they are running. Improvements that would reduce the overall time taken are as follows

    • run the machine at 100% cycle

    • use an extended length drill bit - this will shorten the drill approach and retraction cycle times

    • increase the approach and retraction speeds - this is easily done by an operator in the Siemens / Peddimat MDLB screen.

  • With these improvements the reduction in the drilling time could be as much as 1-2 seconds per hole, with an overall reduction in the part processing time of somewhere between 2 - 4 minutes

Customer Trials

Click here to view the actual beam line video of the customer trial!

This is a 38MB file - it may be faster to right click the link above and "save target as" to save the file to your hard drive.

 

To receive your free video and brochure on this amazing Beam Drill Line, please complete our beam line video and information request form

 

 

Address 6720 NW 15th Way, Fort Lauderdale FL 33309 USA : Toll Free (800) 286 3624 : Tel (954) 956 3131 : Fax (954) 956 3199

Copyright 2000-2010 Ocean Machinery Inc. : Web Design by AP Marketing & Design : Site Map : Links